Overview:

SSG is due FRIDAY. However, most of the hurdles have been overcome. All that is left is, getting the image swapping code to work successfully; as of it, it is uncertain if it is fully possible. I designed a really nice Queue algorithm to solve this problem in very few steps; it would be a shame if Corel Draw’s native coordinate system made it impossible to work.

Events:

- SSG Due friday

- Dry run of SSG went smoothly, on tuesday; all test cases passed. Julie, Lesley and Kathy found numberous typing mistakes; this is Lesley’s department however.
- Will be recruited by Nick Sharp soon enough, to code product mock ups for his team.
- Unfortunately, Steve Murphy will be put behind, because the barcode generator code is not fully operational.

- ECF bake sales, book sales, garage sales are on this week; should be interesting.

Project Notes:

- SSG:

- many, many minor errors have been fixed in the front end.
- hover help has been activated successfully.
- error checking was redone for SSG; one less field is required.
- Ian has yet to fix the security/session errors; he has been reassigned these tasks.

- the zip file problem has been repaired; the entire directory structure is now hidden, thanks to the -j option for winzip.

Mistakes:
- should have finished barcode stuff today.
- really need to get more sleep….:(